
GTIS / Globetech
Two-level stall. Designed, built and installed by our crew.
What we built: Built in December 2024, this stall for GTIS and Globetech Industrial Solutions works on two levels. A raised steel deck on blue columns carries a meeting area upstairs, reached by a yellow staircase, while the ground floor is given over to the material handling equipment the company sells: electric pallet trucks, a scissor lift table, a steel pallet and a mesh cage.
Finishes: The deck is built in the same blue and yellow as the equipment on display. Blue steel columns hold up a galvanised deck, and yellow handrails run around the edge and down the staircase, so the structure itself reads as part of the product story.






