Helipad Exhibition Centre Gandhinagar: Stall Planning Guide
Planning a stall at Helipad Exhibition Centre, Gandhinagar: venue checks, possession and power, a 6 to 8 week timeline and upcoming shows at HEC.

Helipad Exhibition Centre in Gandhinagar is one of Gujarat's largest exhibition grounds. It is used for big trade shows and state expos, and over the coming months it hosts shows in laboratory technology, solar and clean energy, and ceramics. We design the stall in 3D and build it on site with our own crew.
This guide is for exhibitors planning a stall at Helipad Exhibition Centre, often shortened to HEC. It covers the checks to make before design, how to plan around build-up, and the upcoming shows at the venue.
Upcoming shows at HEC
These shows are listed at Helipad Exhibition Centre. Dates are as listed in venue and organiser calendars; confirm with the organiser before planning production.
- Asia Labex: 21 to 23 Jan 2027.
- Intersolar India: 24 to 26 Feb 2027, energy and power.
- India Ceramics Asia: 3 to 5 Mar 2027, construction, building and interiors.
- The Smarter E India: 9 Mar 2027.
- World Green Energy & Sustainability Expo: 7 to 9 May 2027, energy and environment.
With energy shows clustered from February to May, a single modular stall could serve more than one of them. More on that below.
Checks before the design starts
A large exhibition ground is not the same as a permanent convention centre. Conditions are set show by show, so the exhibitor manual for your event is the document to trust. Read it before the design is final and check these points.
- **Hall type:** whether your plot is in a permanent hall or a temporary structure set up for the show.
- **Plot size and open sides:** these decide the layout more than anything else.
- **Height limit:** the maximum build height, and any rules for hanging structures or double-deck stalls.
- **Power:** load available, how to apply and the deadline.
- **Floor:** surface type and any load limits for heavy exhibits such as machines or panels.
- **Load-in:** vehicle entry, unloading points and gate timings.
- **Possession and dismantling dates:** when you can start and when the space must be clear.
Why stall possession dates matter
Your possession date sets the whole timeline. Artwork files must reach us 5 working days before possession, and the stall must be ready to install on the first build-up day. If possession is short, a stall that has already been assembled once and checked saves hours on site.
Designing for large-ground shows
- **Visibility from a distance.** Aisles are wide and visitors cover long distances, so put a clear headline high on the stall.
- **Comfort.** Plan for good lighting and airflow inside the stall, and seating for longer conversations.
- **Heavy exhibits.** Solar inverters, kilns and lab equipment need their positions and power fixed early.
- **Storage.** Large shows mean long days; a lockable store keeps brochures, samples and bags out of sight.
- **Sector focus.** A ceramics stall needs tile and surface displays; a solar stall needs panels and system diagrams; a lab stall needs instruments at bench height.
Timeline for a HEC stall
For shows at Helipad Exhibition Centre, send us a brief **6 to 8 weeks** before the show. For Asia Labex on 21 January 2027, that means briefing between late November and early December 2026.
- Brief with show, plot, open sides, exhibits and goals.
- 3D concept, revisions and approval.
- Organiser submissions, power and furniture orders.
- Fabrication by our own crew, then a full trial assembly against the approved design.
- Final artwork 5 working days before possession.
- On-site installation by our crew and handover.
Practical points for show days
Gandhinagar is the state capital, next to Ahmedabad, and many exhibitors and visitors travel in each day from the larger city. Plan your team's travel and hotel bookings early, as large shows bring in exhibitors from across India at the same time.
- Arrive on the first build-up day to check the stall and place products before the crowd.
- Keep a small kit on the stall: extension boards, tape, cleaning cloths, spare brochures.
- Agree a staff rota so the front of the stall is never empty during peak hours.
- Collect leads in one format, and assign follow-up before the show ends.
One stall for several HEC shows
If you exhibit at Intersolar India and then at The Smarter E India or the World Green Energy & Sustainability Expo, a modular stall can be stored and reused. Graphics change for each show, and the layout adjusts for different plot sizes. Tell us your full show calendar at the brief stage.
Questions exhibitors ask
Do you build the stall at the venue?
We design the stall in 3D and build it on site with our own crew. We do not subcontract the build.
Can you work with a shell scheme plot?
Yes. Even a small shell scheme space can be improved with custom graphics, display units and lighting, as long as the organiser's rules allow it.
How do we get a first design?
Your first stall concept for an upcoming show is free, and we reply within one working day. Use our free stall design form.
