Achema 2027 Stand Guide for Indian Exhibitors in Frankfurt
Planning an Achema stand from India: what process engineers look for, a locally built stand in Frankfurt, a 10-week timeline from 14 Jun 2027 and a checklist.

Achema is one of the best-known international fairs for the process industries: chemical engineering, laboratory equipment, pharmaceutical production, pumps, valves, instrumentation and the digital tools that run plants. The next edition is listed for 14 to 18 Jun 2027 at Exhibition Centre Frankfurt.
Indian suppliers of process equipment, components, chemicals and engineering services use Achema to meet buyers and partners from across Europe and beyond. This guide sets out how we deliver your stand in Frankfurt, what the audience expects and how to plan back from the show dates.
Who you will meet at Achema
Visitors to a process industry fair are largely technical. Plant engineers, R&D teams, procurement heads, project consultants and distributors come with specific problems to solve. They judge a supplier on detail, documentation and the people on the stand.
- Engineers who want to see build quality, materials and connection details up close.
- Procurement teams comparing suppliers on standards, certification and delivery record.
- Distributors looking for product lines to add in their own markets.
- Project consultants who specify equipment for new plants and expansions.
What your stand should showcase
A technical audience rewards a stand that lets the product speak. Keep slogans short and give the space to equipment, cut-aways and clear data.
- One or two hero products on plinths with strong, even lighting.
- Cut sections or exploded views where the quality sits inside, such as pump internals or valve seats.
- A wall panel listing materials, standards and certifications in plain English.
- A screen showing the product working in a plant, placed so it does not block the display.
- A meeting area with a table, where drawings and specifications can be discussed properly.
Heavy equipment needs planning with the organiser for floor loading and move-in. We factor that into the drawings.
Layout for a process equipment stand
Most process stands work best with three zones. The front holds the hero equipment, angled so it can be seen from both aisles. The middle holds smaller products, samples and data panels at eye height. The back holds a meeting area with a table, a screen for presentations and storage for literature and bags.
Keep walkways inside the stand wide enough for two people to pass. Engineers like to walk around equipment and look at it from every side. A cramped stand stops them doing that and shortens the conversation.
Staffing the stand
Roster at least one application engineer for every shift. Buyers at a process fair ask detailed questions about materials, tolerances and integration. A good answer on the spot is worth more than any brochure. Brief the whole team on which enquiries go to which person before the doors open.
How the stand is built in Frankfurt
Nothing is shipped from India. We design the stand in 3D, it is built locally near the venue to our drawings, and our team manages the build and installs it. You avoid freight and customs for the structure, though your own exhibits still need their own shipping plan.
German fairgrounds usually ask for stand drawings and technical details for approval before build-up. We prepare that package from our design files so it can go in on time.
Timeline working back from 14 Jun 2027
- By 5 Apr 2027: brief, stand plot plan and list of exhibits. This is roughly 10 weeks ahead.
- By 19 Apr 2027: 3D design approved by your team.
- By 26 Apr 2027: drawings submitted to the organiser.
- From 3 May 2027: local fabrication near the venue; graphics drafted.
- Artwork files final at least 5 working days before stall possession, as given in the exhibitor manual.
- 14 to 18 Jun 2027: show days, followed by dismantling.
Your exhibits may need even longer than the stand. If machinery is travelling from India, speak to your freight forwarder about the fair's delivery window early in the process.
Checklist for Indian exhibitors
- Space contract signed and plot plan received from the organiser.
- Visas, flights and Frankfurt hotels booked well ahead of June.
- Exhibit shipping planned with a forwarder who handles fair deliveries.
- Product literature in English, with a German summary sheet if your buyers expect it.
- Technical staff, not only sales staff, rostered for every show day.
- Lead capture method agreed before the first visitor arrives.
Questions exhibitors ask
Can we see a design before deciding?
Yes. The first stall concept is free for an upcoming show, and we reply within one working day. Ask for a free stall design with your plot size and exhibit list.
Do you handle the organiser's technical approval?
We prepare the drawings and technical details the organiser asks for, and coordinate with them during the build. The exhibitor contract stays with your company.
Is 10 weeks really necessary?
It is the minimum we plan for. Approval and local fabrication both take time, and a June show sits in a busy season for European stand builders.