# Our crew on site: framing, panelling and finishing a stall at the venue

> Photos of the KaamKraft crew at work on a show floor: laying the timber platform frame, fixing wall panels and battens, cutting on site and finishing the structure on ladders.

Canonical: https://kaamkraft.com/case-studies/case-stall-installation-crew-on-site

Last updated: 2026-10-26

- **Client**: KaamKraft
- **Category**: Behind the scenes
- **Published**: 2026-10-26
- **Tags**: Installation, Behind the scenes, Crew

**What this shows**

These photos are from a stall build on a show floor, taken by our team during install. Most of the stall is made in our factory in sections; on site, our own crew frames the platform, raises and fixes the walls, joins the sections and finishes every edge before the graphics and lighting go in.

**On site, step by step**

The build starts with the floor: a timber platform frame is laid out and levelled, then boarded over. The wall frames, made in the factory with plywood and battens, are raised and fixed to the platform and to each other.

Once the structure stands, the crew fixes the panels and fascia, working from ladders and wearing hard hats when overhead. Small cuts and adjustments are made on the spot, so the stall matches the approved design exactly.

**Why it matters**

The same crew that builds the stall in our factory installs it at the venue, stays on call through the show and dismantles it at the end. Nothing is handed to an unknown local team on the day.

_Laying the timber platform frame_

_Fixing the base of the wall_

_Fixing battens and panels on a tall wall_

_Cutting a batten on the show floor_

_Fixing the fascia, in hard hats_