# IDAC New Delhi 2027 Stall Guide: Planning at NSIC Exhibition Grounds

> IDAC New Delhi stall guide for 14 to 16 Jan 2027 at NSIC Exhibition Grounds: energy and environment audiences, layout ideas, timeline and a checklist.

Canonical: https://kaamkraft.com/blog/idac-new-delhi-stall-guide

Last updated: 2026-10-26

- **Category**: Show guides
- **Published**: 2026-10-26
- **Tags**: IDAC New Delhi, NSIC Exhibition Grounds, energy and environment, New Delhi, exhibition stall

[IDAC New Delhi](https://kaamkraft.com/shows/idac-new-delhi) is listed for **14 to 16 January 2027** at the [NSIC Exhibition Grounds](https://kaamkraft.com/venues/nsic-exhibition-grounds-new-delhi) in Okhla, New Delhi. Venue calendars place it under energy, power and environment. Read the organiser's own profile for the exact product categories before you plan what to display.

This guide takes a practical view. It covers the visitors an energy and environment show in Delhi tends to draw, what a stall needs to do for them, how to handle the conditions at an exhibition ground, and a timeline working back from mid-January. Dates are as listed in venue and organiser calendars; confirm with the organiser.

## Who an energy and environment show draws

Shows in this sector bring together the people who build, buy, approve and maintain power and environmental systems. In Delhi, that includes a large share of government, public sector and institutional buyers alongside private industry.

- **Engineers and project managers** from utilities, industry and infrastructure projects.
- **Procurement teams** comparing vendors on specification, price and delivery.
- **Consultants** who write specifications and approve vendor lists.
- **Dealers and system integrators** covering north India.
- **Facility managers** looking at efficiency, monitoring and compliance solutions.

_The arch entrance, with the crushers on either side_

## What the stall should showcase

Energy and environmental products are often large, heavy or invisible in use. The stall has to make the benefit clear without relying on bringing the whole system.

1. A hero product or component, well lit and placed at the open side.
2. A simple system diagram showing where your product fits, readable from the aisle.
3. A live dashboard or monitoring demo if you sell software or controls.
4. Approvals, test certificates and standards compliance, shown clearly.
5. Short case studies with results you can back up, on a screen or printed panel.
6. A meeting table for detailed discussions with consultants and buyers.

### Layout ideas

For equipment makers, an island or corner layout with the machine at the front and a meeting area behind works well. For software and monitoring brands, two or three demo stations along a counter allow several conversations at once. Keep a clear aisle edge so visitors do not feel they are entering a closed office.

### Talking to public sector and institutional buyers

Delhi shows often draw officials and engineers from public sector bodies. They tend to look for proven compliance and a track record. Keep approvals, empanelments you genuinely hold and reference projects easy to find, and have someone senior on the stall who can speak to tender and qualification questions.

## Planning for an exhibition ground in January

NSIC Exhibition Grounds hosts shows in halls and hangar-type structures, depending on the event. Conditions can differ from a modern convention centre, so check the exhibitor manual and plan for them in the design.

- Confirm whether your plot is in a permanent hall or a temporary structure.
- Check floor levels; a raised platform evens out the floor and hides cables.
- Plan your own stall lighting; hangar lighting can be dim, especially in winter.
- Check floor load and access routes for heavy equipment.
- Delhi winter mornings can be cold and foggy; allow extra time for set-up and staff travel.

## Timeline working back from 14 January

We ask for the brief **6 to 8 weeks** before the show. For 14 January 2027, that window runs from about 19 November to 3 December 2026. The year-end holidays fall inside the build period, so do not leave approvals late.

1. Brief: plot details, exhibits, heavy items and demo needs.
2. 3D concept, revisions and approval.
3. Organiser submission and power application per the exhibitor manual.
4. Fabrication; every stall is assembled once and checked against the approved design before it leaves.
5. Artwork files to us 5 working days before stall possession.
6. Our own crew installs at the venue and hands over before opening.

## Mistakes to avoid

- Bringing equipment without confirming floor load and access in advance.
- Under-ordering power for demos, lighting and screens.
- Walls full of text that no one reads from the aisle.
- No quiet area for consultants who want to discuss specifications.
- Ignoring weather; cold, damp mornings can delay paint and graphic work if left late.

A focused stall usually performs better at an energy show than a crowded one. Choose the product lines you most want enquiries for, show those well, and keep the full range in a catalogue.

Think too about how leads will be handled. Energy projects move slowly, and a good conversation in January may turn into an order months later. Note each visitor's project, timeline and decision role, and agree who follows up and when.

When you brief us, attach the exhibitor manual, your plot plan and a list of exhibits with weights and power needs. Mention if your plot is in a temporary structure. These details shape the platform, lighting and power layout in the first concept and help avoid changes after the organiser has approved your drawings.

## Questions exhibitors ask

### We are not sure what IDAC covers. Can you still help?

Yes. Share your product and the organiser's exhibitor information, and we will design for the audience the show describes.

### Can the stall be reused at another energy show?

Yes. Stalls can be stored and reused for the next show, with graphics updated for each audience.

### How do we get a first concept?

Send your plot details through our [free stall design page](https://kaamkraft.com/free-stall-design). The first concept for an upcoming show is free, and we reply within one working day.

## Related

- [Blog](https://kaamkraft.com/blog)
- [Home](https://kaamkraft.com/)
